Work Processes and Operational Effectiveness (Category 6)
Identify a computing school's key work processes and support processes, set their requirements and in-process measures, improve them, control cost (including cloud lab spend), manage the supply network, and plan for safety, business continuity, and resilience.
What Category 6 Asks
Category 6 (85 points) is about how the work gets done:
- 6.1 Work Processes (40): how you determine requirements for your educational programs, services, and key work processes, how you design them, how you manage them day to day with in-process measures, how you manage support processes, and how you improve them.
- 6.2 Operational Effectiveness (45): how you control cost and keep processes efficient and effective, manage the supply network, and ensure safety, business continuity, and resilience.
In 2023–2024, 6.2 gained points because it now covers the supply network, continuity, and risk. (Cybersecurity is handled in 4.2.)
STC’s Key Work Processes
Key work processes create value for students and other customers directly. Support processes make them possible. Name both, and keep the list short.
Requirements and In-Process Measures
For each key work process, define requirements (drawn from student, employer, accreditation, and regulatory needs) and the in-process measures that tell you during the term, not after it, whether you’re meeting them.
| Key work process | Key requirements | In-process measures | Outcome measures (Cat. 7) |
|---|---|---|---|
| 1 Design programs | Employer-aligned outcomes; transfer-friendly; accessible; AI-resilient assessment | Advisory-board review completed; accessibility check passed before launch | Employer ratings of graduates; time to degree |
| 2 Deliver courses | Consistent quality across sections; instructor presence; working labs | Instructor feedback within 72 hours; week-2 engagement; lab uptime | DFW rate; course satisfaction by segment |
| 3 Assess learning | Valid, rubric-based assessment of program outcomes; usable for ABET and NWCCU | Rubric scoring calibration (inter-rater agreement); share of sections submitting data | Outcome attainment by program and segment |
| 4 Support student success | Proactive, available outside 9-to-5; fits each segment | Alert follow-up within 48 hours; coach contact by week 3 | Persistence; completion |
| 5 Connect to careers | Internships and capstones with real employers; career support for international students | Capstone sponsors secured by week 4 | Employment in field within six months |
Design is where AI shows up in operations. STC’s course-design standard now requires each major assessment to state its AI-use level and to include at least one element AI can’t do for the student: an oral defense, a live demonstration, or a reflection on the student’s own process.
Improvement uses the PDSA cycle from P.2c. Gateway course redesign (SO2, action plan B) is an example: analyze DFW data by topic, redesign the hardest two weeks, run it across all sections, and compare.
Operational Effectiveness (6.2)
Cost control and efficiency
| Cost driver | STC’s approach |
|---|---|
| Cloud lab spend | Per-course budgets, auto-shutdown of idle resources, monthly spend review by course; cost per student-lab-hour tracked |
| Low-enrollment sections | Decisions made six weeks before start (not one week), so students and adjuncts aren’t disrupted; cross-listing graduate and undergraduate sections where outcomes allow |
| Rework | Master shells mean course fixes are made once, not 15 times |
Supply-network management
STC sets requirements for key suppliers and checks performance: LMS uptime and support response, cloud-lab provider reliability and pricing, and transfer-credit turnaround from articulation partners. It gives suppliers feedback at an annual review. The cloud-lab provider contract includes an exit plan, so labs could move to another provider within one quarter if needed.
Safety, business continuity, and resilience
STC’s continuity plan covers the disruptions that are most likely or most damaging:
| Disruption | Plan |
|---|---|
| Earthquake or building closure (Seattle) | Every hybrid course can switch to fully online within 48 hours; course shells are built to support this from the start |
| LMS outage during finals | Published fallback: email submission and extended deadlines; vendor escalation path |
| Cloud lab outage | Downloadable local lab images for core courses |
| Sudden loss of key faculty | Every course has a designated backup instructor and a complete master shell |
| Enrollment shock (e.g., visa policy) | Triggers in 2.2b to re-plan; contingency budget reserve |
Each plan is tested. STC runs one tabletop exercise a year and does a live switch-to-online drill for one week each fall.
Here’s the earthquake plan as a 48-hour timeline:
Common mistake: STC’s first process list had 46 “key work processes,” from “order textbooks” to “approve travel.”
Key work processes are the few (usually four to seven) that create value for students and other customers. Everything else is a support process. With 46 key processes, none get the design rigor, measures, and improvement attention the important ones need.
Key Takeaway
Category 6 asks you to name your few key work processes and their support processes, define requirements from students, employers, and accreditors, manage with in-process measures, and improve systematically. Operational effectiveness covers cost control (cloud spend and section planning), supply-network requirements and exit plans, and tested plans for safety, continuity, and resilience.
Pick one key work process at your school (course delivery is a good start). Write:
- Its three or four key requirements, and where each came from (students, employers, accreditor, regulation)
- Two in-process measures you can see during the term
- One outcome measure you’d report in Category 7
- Your last improvement to it: what changed, when, and how you know it helped
If you can’t answer step 4, the process has no improvement cycle yet.
1. What distinguishes a key work process from a support process?
Key work processes deliver your programs and services. Support processes make them possible.
2. Which is an in-process measure for course delivery?
In-process measures show performance during the term, so problems can be fixed before outcomes suffer.
3. Why does STC's cloud-lab contract include an exit plan?
6.2 covers supply-network management and business continuity. An exit plan reduces dependence on a single supplier.
4. STC lists 46 key work processes. What's the problem?
Key processes are the few that create value directly. A long list dilutes focus.