The Lockout Sequence, Step by Step
Walk through the required order of lockout (prepare, notify, shut down, isolate, apply devices, control stored energy, and verify) with what to do and what goes wrong at each step.
The Order Matters
OSHA 1910.147 lays out the application of energy control in a specific sequence. Doing the steps out of order creates gaps. For example, isolating before a normal shutdown can damage equipment or release energy violently.
- 1 Prepare
Review procedure; know every energy source
- 2 Notify
Tell affected employees
- 3 Shut down
Normal stop
- 4 Isolate
Every source, at the device
- 5 Lock + tag
Your own lock on each point
- 6 Stored energy
Bleed, block, discharge
- 7 Verify
Try to start; test for zero
1. Prepare
Before touching anything, the authorized employee must know:
- The type and magnitude of every energy source
- The hazards of that energy
- The methods to control it
Get the machine-specific procedure. Gather the right locks, tags, devices, test equipment, and blocks. If the job scope changed (for example, now you need to open a hydraulic line), make sure the procedure covers it.
2. Notify Affected Employees
Tell the operators and others in the area that the machine is being locked out, and why. This prevents surprises, like an operator trying to “help” by restarting.
3. Shut Down
Stop the machine using its normal stopping procedure: the stop button, the cycle-stop, or the control system. A normal stop brings moving parts to rest in a controlled way and avoids damage or added hazards from cutting power to a running machine.
4. Isolate
Operate every energy-isolating device so the machine is isolated from all sources: electrical disconnects, air valves, hydraulic valves, steam, process lines, and so on.
- Isolate at the device, not at controls.
- Watch for machines fed from more than one electrical source (main power, a separate control transformer feed, a UPS, heater circuits).
5. Apply Lockout/Tagout Devices
Each authorized employee applies their own lock (and tag, where used) to each isolating device:
- Lock holds the device in the safe or OFF position.
- Tag is attached at the same point, stating who, when, and why.
- Use hasps or group lockboxes when several people work on the job (Module 4).
6. Control Stored Energy
After isolation, release, restrain, or otherwise make safe all stored and residual energy:
- Bleed air and hydraulic pressure; drain or block accumulators
- Discharge capacitors (and wait for drives to discharge)
- Block or lower raised parts; install safety pins
- Release or block spring tension
- Let flywheels and rolls coast to a full stop
- Cool hot surfaces or allow time; vent and drain process lines
If stored energy could re-accumulate (for example, pressure building again), keep checking it until the job is done.
7. Verify Isolation
Before starting work, verify the machine is isolated and de-energized:
- Make sure everyone is clear of the machine.
- Try to start it with the normal controls (the “try-out”).
- Test electrical circuits for absence of voltage with a properly rated meter.
- Check gauges read zero for air and hydraulics.
- Return the controls to OFF or neutral after the try-out.
Common mistake: the tech presses Start during verification, nothing happens (good), and they go to work. The start selector is left in RUN.
When the locks come off later, the machine starts instantly, possibly while someone is still reaching in. Always return controls to OFF or neutral after the try-out.
Key Takeaway
Follow the sequence: prepare → notify → shut down → isolate → lock and tag → control stored energy → verify. Isolate every source at the device, put your own lock on each, release or block stored energy, and try to start and test before work begins. Return controls to OFF after trying.
A mechanic is about to change a cutting blade on a carton sealer. Put these in the correct order:
- A. Press Start to confirm nothing moves, then return the switch to OFF
- B. Tell the operator the machine is going down
- C. Bleed air at the dump valve and pin the raised sealing head
- D. Read the machine-specific procedure
- E. Apply a personal lock to the disconnect and the air dump valve
- F. Stop the machine with the cycle-stop button
- G. Turn the disconnect OFF and close the air dump valve
Answer: D, B, F, G, E, C, A
1. Which step comes immediately before isolating energy sources?
The machine is shut down normally first, then isolated at each energy-isolating device.
2. Why should you stop the machine normally before opening the disconnect?
Normal shutdown brings motion to a controlled stop before isolation.
3. What should you do after pressing Start during verification and confirming nothing moves?
Leaving controls in RUN can cause an immediate start when energy is restored.
4. If stored energy could build back up during the job, what must you do?
When re-accumulation is possible, verification must continue until servicing is done.