Periodic Inspections and Common Program Failures
Module 5 · Release and Inspection

Periodic Inspections and Common Program Failures

Conduct the annual periodic inspection OSHA requires, certify it correctly, and learn the most common ways LOTO programs fail in practice so you can catch them before an injury does.

The Annual Check-Up

OSHA requires employers to conduct a periodic inspection of each energy control procedure at least annually to make sure the procedure and the standard’s requirements are being followed.

Who Inspects

The inspection must be done by an authorized employee other than the one(s) using the procedure being inspected. In other words, you can’t inspect your own lockout. Many plants use trained peers from another area, maintenance planners, or safety staff who are also authorized employees.

What the Inspection Includes

  1. 1 Select

    Procedure and machine

  2. 2 Observe

    Watch it performed for real

  3. 3 Review

    Responsibilities with each worker

  4. 4 Correct

    Fix deviations and gaps

  5. 5 Certify

    Machine, date, people, inspector

Deviations lead to procedure updates and retraining, then the next inspection checks they stuck.
  • Observe the procedure being performed, not just read it. Is every step followed? Is every energy source isolated and verified?
  • Review responsibilities with each authorized employee using the procedure (for lockout). Where tagout is used, the review covers each authorized and affected employee and includes the limitations of tags.
  • Correct any deviations or inadequacies found.

Certification

The employer must certify that periodic inspections were performed. The certification identifies:

  • The machine or equipment the procedure was used on
  • The date of the inspection
  • The employees included in the inspection
  • The person performing the inspection

Machines that share the same procedure can be grouped, but the inspection should still reflect real-world use.


How LOTO Programs Fail

Lockout/tagout consistently appears on OSHA’s list of the most frequently cited standards. The citations and incident investigations show the same patterns again and again:

FailureWhat it looks like on the floor
No written procedures or generic onesA one-size “Turn off, lock, tag” sheet for every machine
Procedures don’t match the machineMissing energy sources, wrong disconnect numbers, no stored energy steps
No verificationLocks applied, nobody tries to start or tests for voltage
No periodic inspections, or “paper” inspectionsSigned forms with nobody actually observed
Inadequate trainingOperators don’t know what affected means; new hires untrained
Minor servicing misuseRoutine jam clearing done with guards open and no effective alternative
Shared or missing locksOne lock for a crew; personal padlocks from home
Unsafe lock removalLocks cut without the absent-employee procedure
Contractor gapsContractors using their own system with no coordination
⚠️ Common Pitfall: The Perfect Paperwork Program

Common mistake: the program binder is flawless, with every machine documented and every inspection signed, but nobody has watched an actual lockout in years.

Auditors and investigators look at what happens on the floor. Real periodic inspections mean watching someone lock out, asking them to explain each step, and fixing what you find.


Leading Indicators

Don’t wait for an injury to measure your program. Track:

  • Percentage of machines with validated, machine-specific procedures
  • Periodic inspections completed on time, and number of deviations found and closed
  • Near misses reported involving energy control
  • Training completion by role
  • Lock removal exceptions (each one should be reviewed)

Key Takeaway

Inspect each procedure at least annually, done by an authorized employee who isn’t using it, by observing real use and reviewing responsibilities. Certify with machine, date, employees, and inspector. Watch for the classic failures: generic procedures, no verification, paper inspections, misuse of minor servicing, and unsafe lock removal.

🧪 Try It: Run a Mini-Inspection

Ask a qualified coworker to perform a lockout on a machine (with real isolation). As the observer, check:

  1. Did they notify affected employees?
  2. Did they use a normal stop first?
  3. Did they isolate every source listed on the procedure, and was anything missing from the procedure?
  4. Did they handle stored energy?
  5. Did they verify with a try-out and testing, then return controls to OFF?
  6. Could they explain their responsibilities?

Record what you found and one improvement for the procedure.

🧠 Knowledge Check

1. How often must periodic inspections of energy control procedures be conducted?

2. Who may perform the periodic inspection?

3. What must the inspection certification identify?

4. Which is a sign of a 'paper' LOTO program?