Glossary and Course Review
Review the vocabulary of port terminals, cranes, and rigging, walk through a lift from planning to landing, and test yourself across the whole course.
A Lift, Start to Finish
- M2 Weight
VGM, documents, CSC plate
- M2 Capacity
Radius, chart, deductions
- M3 Rigging
WLL, inspection, sling angles
- M4 Plan + zone
Critical? Barricade
- M4 Signals
One signaler; anyone can stop
- M4 Test lift
Level, seated, brakes hold
- M5 Land + secure
Twistlocks, lashings
Glossary
| Term | Meaning |
|---|---|
| AGV | Automated guided vehicle |
| Backreach / outreach | How far a crane reaches landside / over the water |
| Basket / choker / vertical hitch | Ways to rig a sling |
| Cell guides | Vertical rails holding containers in a ship’s hold |
| CG | Center of gravity |
| Corner casting | Reinforced fitting at each container corner for lifting and securing |
| CSC plate | Container safety approval plate showing max gross mass |
| Critical lift | Lift requiring a formal written plan due to weight, method, or hazards |
| Dwell time | Time a container stays in the terminal |
| FEU / TEU | Forty- / twenty-foot equivalent unit |
| Gantry / trolley / hoist | Crane travel along rails / along the boom / up and down |
| ILWU | International Longshore and Warehouse Union (U.S. West Coast longshore workers) |
| Lashing rod / turnbuckle | Deck securing gear for containers |
| Load moment | Load × radius |
| NWSA | Northwest Seaport Alliance (Seattle and Tacoma) |
| RCI / LMI | Rated capacity indicator / load moment indicator |
| RTG / RMG | Rubber-tired / rail-mounted gantry crane |
| SATL | Semi-automatic twistlock |
| Spreader | Frame that locks onto a container’s corner castings |
| STS crane | Ship-to-shore container crane |
| TOS | Terminal operating system |
| TWIC | Transportation Worker Identification Credential |
| VGM | Verified gross mass of a packed container |
| WLL | Working load limit |
Formulas to Remember
| What | Formula |
|---|---|
| TEU count | 20-ft boxes × 1 + 40-ft boxes × 2 |
| Load moment | Load × radius |
| Total hook load | Load + all rigging below the boom tip |
| Sling leg tension | (Load ÷ legs) ÷ sin(angle from horizontal) |
| Load angle factor | 60° = 1.155 · 45° = 1.414 · 30° = 2.000 |
A 36,000 lb piece of machinery must be lifted from a ship’s deck to a flatbed truck using a mobile harbor crane.
- Rigging: spreader bar (1,200 lb), four slings and shackles (600 lb), hook block (1,800 lb)
- The worst-case radius is 74 ft; the chart lists 70 ft: 48,000 lb and 80 ft: 40,000 lb
- Two lifting lugs on the machine; slings from the spreader bar will be vertical
Work it out:
- Total hook load? 36,000 + 1,200 + 600 + 1,800 = 39,600 lb
- Chart capacity to use? Round up to 80 ft → 40,000 lb
- Percent of capacity? 39,600 ÷ 40,000 = 99%. Far too close. (Most sites would call this critical and require changes: reduce the radius by repositioning the crane or ship, use a larger crane, or lighten the rigging.)
- If the crane moves closer so the worst radius is 65 ft (use the 70 ft row, 48,000 lb): 39,600 ÷ 48,000 = 83%. Still a critical lift under many company rules, needing a written plan.
Write the remaining parts of the plan: exclusion zone, signal person and radio channel, wind limit, ship stability coordination, and test lift.
1. A ship discharges 500 forty-foot and 300 twenty-foot containers. How many TEUs?
500 × 2 + 300 × 1 = 1,300 TEU.
2. Which STS crane motion moves the entire crane along the wharf?
Gantry travel moves the whole crane along its rails.
3. A two-leg bridle lifts 8,000 lb at 30° from horizontal. What is the tension per leg?
(8,000 ÷ 2) × 2.000 = 8,000 lb per leg.
4. Who can signal an emergency stop to the crane operator?
Anyone who sees danger may signal stop, and the operator must obey.
5. What must happen before a packed export container is loaded on a ship?
SOLAS requires a VGM for packed export containers before loading.
6. Which OSHA standard covers work on the marine terminal (land side)?
Part 1917 covers marine terminals; Part 1918 covers longshoring aboard vessels.