Glossary and Course Review
Module 6 · The Future Waterfront and Review

Glossary and Course Review

Review the vocabulary of port terminals, cranes, and rigging, walk through a lift from planning to landing, and test yourself across the whole course.

A Lift, Start to Finish

  1. M2 Weight

    VGM, documents, CSC plate

  2. M2 Capacity

    Radius, chart, deductions

  3. M3 Rigging

    WLL, inspection, sling angles

  4. M4 Plan + zone

    Critical? Barricade

  5. M4 Signals

    One signaler; anyone can stop

  6. M4 Test lift

    Level, seated, brakes hold

  7. M5 Land + secure

    Twistlocks, lashings

Any surprise during the lift means STOP, set down if safe, and re-plan.

Glossary

TermMeaning
AGVAutomated guided vehicle
Backreach / outreachHow far a crane reaches landside / over the water
Basket / choker / vertical hitchWays to rig a sling
Cell guidesVertical rails holding containers in a ship’s hold
CGCenter of gravity
Corner castingReinforced fitting at each container corner for lifting and securing
CSC plateContainer safety approval plate showing max gross mass
Critical liftLift requiring a formal written plan due to weight, method, or hazards
Dwell timeTime a container stays in the terminal
FEU / TEUForty- / twenty-foot equivalent unit
Gantry / trolley / hoistCrane travel along rails / along the boom / up and down
ILWUInternational Longshore and Warehouse Union (U.S. West Coast longshore workers)
Lashing rod / turnbuckleDeck securing gear for containers
Load momentLoad × radius
NWSANorthwest Seaport Alliance (Seattle and Tacoma)
RCI / LMIRated capacity indicator / load moment indicator
RTG / RMGRubber-tired / rail-mounted gantry crane
SATLSemi-automatic twistlock
SpreaderFrame that locks onto a container’s corner castings
STS craneShip-to-shore container crane
TOSTerminal operating system
TWICTransportation Worker Identification Credential
VGMVerified gross mass of a packed container
WLLWorking load limit

Formulas to Remember

WhatFormula
TEU count20-ft boxes × 1 + 40-ft boxes × 2
Load momentLoad × radius
Total hook loadLoad + all rigging below the boom tip
Sling leg tension(Load ÷ legs) ÷ sin(angle from horizontal)
Load angle factor60° = 1.155 · 45° = 1.414 · 30° = 2.000

🧪 Try It: Capstone: Plan a Breakbulk Lift

A 36,000 lb piece of machinery must be lifted from a ship’s deck to a flatbed truck using a mobile harbor crane.

  • Rigging: spreader bar (1,200 lb), four slings and shackles (600 lb), hook block (1,800 lb)
  • The worst-case radius is 74 ft; the chart lists 70 ft: 48,000 lb and 80 ft: 40,000 lb
  • Two lifting lugs on the machine; slings from the spreader bar will be vertical

Work it out:

  1. Total hook load? 36,000 + 1,200 + 600 + 1,800 = 39,600 lb
  2. Chart capacity to use? Round up to 80 ft → 40,000 lb
  3. Percent of capacity? 39,600 ÷ 40,000 = 99%. Far too close. (Most sites would call this critical and require changes: reduce the radius by repositioning the crane or ship, use a larger crane, or lighten the rigging.)
  4. If the crane moves closer so the worst radius is 65 ft (use the 70 ft row, 48,000 lb): 39,600 ÷ 48,000 = 83%. Still a critical lift under many company rules, needing a written plan.

Write the remaining parts of the plan: exclusion zone, signal person and radio channel, wind limit, ship stability coordination, and test lift.

🧠 Knowledge Check

1. A ship discharges 500 forty-foot and 300 twenty-foot containers. How many TEUs?

2. Which STS crane motion moves the entire crane along the wharf?

3. A two-leg bridle lifts 8,000 lb at 30° from horizontal. What is the tension per leg?

4. Who can signal an emergency stop to the crane operator?

5. What must happen before a packed export container is loaded on a ship?

6. Which OSHA standard covers work on the marine terminal (land side)?